In a windowless room behind a beach in western Brittany, blue cords hang from a rack in two heavy curtains. Each ends in a small lit port. At 02:14 one column of lights goes out from top to bottom, like a lift descending, and for a few thousandths of a second part of the conversation between two continents has nowhere to go. Then it finds another route. Nobody’s film stutters. A payroll in Montreal goes through.
Two hundred and twenty kilometres out, on the Perpetua Lind, a telephone rings beside Captain Maren Dahl’s bunk. She has slept in her socks. She looks at the number before she picks it up, says “Yes, I thought it might be you”, and puts her feet on the floor.
The call she expected
Dahl is 52, from Stavanger, and has repaired cables for 23 years. Her ship is 128 metres long, carries 61 people and spends much of the year in port with its tanks full of spare cable, waiting like a fire engine. This time she had sailed ten hours before the fault, on the strength of a list.
The list arrives every afternoon from Undertow, a forecasting office of seven people in Bergen that her employer, Meridian Wet Works, pays by the year. It ranks stretches of seabed by how likely they are to lose a cable in the next day. Crews call it the tomorrow list. The top line on the previous afternoon was a shelf edge south-west of Brest, at a probability of 3.1%.
That does not sound like much. The usual figure for any stretch is below a hundredth of one per cent.
Who breaks a cable
People ask Dahl about sharks and spies. She has seen tooth marks once, on a section kept in a glass box in the mess. Of the 94 faults she has repaired, by her own notebook, 61 came from fishing gear or anchors. Eleven were landslides on the slope. The rest were chafing, age and, twice, a manufacturer’s mistake.
So the list is mostly a forecast of people. It takes the positions ships broadcast, the state of the sea and the price of fish at auction, because when sole is dear the trawlers work closer to the charted cables. It takes the wind, which drags anchored ships. It takes the age of each section and how deep it was buried by the plough that laid it.
The boats inshore
The smallest boats worry her least. They work in sight of land with lines and pots, and their owners ring the hotline when they feel something heavy. The hotline pays for lost gear without argument. It has cost Meridian about €400,000 in five years, less than two days of a repair.
The boats offshore
A trawler can pull a steel beam across the bottom at four knots. If it snags a cable the skipper feels a lurch and often hauls, because the net alone is worth more than his car. The cable comes up, kinks and dies. He may never know what he caught.
Grapnel
We reach the place at 07:40 in a long grey swell. On the test bench in the cable control room, an engineer called Tomasz Rey sends a pulse of light down the good half of the line and times the echo. The break is 41.7 kilometres from the last repeater, in 1,140 metres of water. His finger leaves a print on the chart.
What follows would be familiar to a sailor of the 1870s. The ship steams slowly across the line of the cable, towing a set of steel hooks on a rope three times as long as the sea is deep. The bridge is silent. Everyone watches a dial that shows the tension on the rope, waiting for it to rise as a cable the width of a garden hose drags over the bottom and into a hook.
The first pass takes three hours and catches nothing. On the second, at 13:05, the needle climbs from four tonnes to seven, hesitates and stays.
You never see the thing you are doing. You feel it come up the rope, and you decide whether to believe your hands.
Gwen Abara, the bosun, says this with her palm flat on the winch housing. She has been with Dahl for nine years and is the only person aboard who may tell her to stop.
Hands inside the joint
The end that comes over the bow sheave is black, slick and smells of tar and low tide. It is cut back until the fibres are clean, then walked by six people in gloves to the jointing room, a cabin kept at 21 degrees with a lock on the door.
Inside, two jointers take turns. Ines Carvalho and Paul Mbeki-Strand each splice eight of the sixteen fibres, strands of glass thinner than a hair, pushing the ends together under a microscope while an arc welds them. A bad splice loses light. Each one is tested from Brittany before the next begins, and the voice on the line from the beach says only a number. Below 0.04 is good. At 0.06 Carvalho breaks it and starts again without a word.
The steel and copper go back on. Plastic is moulded round the joint in a press and then X-rayed, like a wrist. Sixteen hours after the first cut, they bring tea.
What the list missed
At breakfast on the second day Dahl opens the notebook she keeps on the tomorrow list. She grades each line when the day is over. Since the service began two years ago, the top ten have included 14 of the 33 faults in her zone. That is far better than chance, she says, and it means that 19 times she was somewhere else.
One of those is underlined. In spring a section off Galicia parted on a windless night with no ships within twenty miles. It was nowhere on the list. Undertow’s chief forecaster, Sunniva Holt, came aboard to see the recovered end and found that it had been rubbing against a rock since the day it was laid, 17 years earlier. “The model had never met patience,” Holt told the crew.
She has since added the shape of the seabed at a finer scale. She has also added a column in which captains may write what they feel. It is the only column that a machine does not fill in, and on Dahl’s lines it has a small positive score. A similar human column survives in the control room of a railway junction we visited.
A yacht at the buoy
By the third afternoon the swell has gone. The sea is flat and very blue, with a row of small clouds along the horizon, and the cable has to be held dead still while the final joint goes over the side. Then a sail appears.
It is a family on passage to Spain. Dahl raises them on the radio and asks them, in good French and then in better English, to pass a mile to the south. A child’s voice asks what the ship is doing. “Mending the telephone,” says Dahl. There is a pause. “Whose?” says the child. She thinks about it. “Probably yours.”
Power on
At 17:22 the beach sends power down the line, 4,000 volts at first, then more. In the control room Rey reads the echo and there is no echo, only a long clean slope to the next repeater and the one after it. On land, behind the dunes, the column of lights comes back from the bottom up.
The joint slides under the surface on a slip rope, with Abara’s palm on the line until the depth counter passes 1,140. She takes her hand away. The bow swings round to the north.
The new list has come in during the last hour. Dahl reads the top line standing, with her glasses pushed up. It is a patch of shallow water off the Scillies at 1.9%, with a gale due after midnight and three ships at anchor. She writes a number in her own column and asks the engine room how soon they can make fourteen knots.
Discussion